Input Voltage Range: 2.7 V to 20 V
Output Voltage Range: 4.5 V to 20 V
Programmable Switch Peak Current: up to 10 A
Two 16-mΩ FETs Integrated
Efficiency up to 96%: VIN = 7.2 V, VOUT = 16 V, IOUT = 2 A
Adjustable Switching Frequency: up to 2.2 MHz
External Clock Synchronization:
200 kHz to 2.2 MHz
Gate Driver for Load Disconnect
Hiccup Short Protection
Over Voltage Protection
Auto PFM Operation – TPS61178
Forced PWM Mode – TPS611781
3.0-mm x 3.5-mm 13-pin VQFN Hotrod Package
Create a Custom Design Using the TPS61178 With the WEBENCH® Power Designer
The TPS61178x family is a 20-V synchronous Boost converter with the gate driver built-infor load disconnect. The TPS61178x integrates two low on-resistance power FETs: A 16-mΩ switchingFET and a 16-mΩ rectifier FET.
The TPS61178x uses the fixed frequency peak current mode control with the slopecompensation integrated. At the light load, the TPS61178 enters into the auto PFM mode whileTPS611781 is in the forced PWM mode.
The TPS61178x could isolate the output from input side when shutdown. Once the output isshorted, it enters into the hiccup mode to lower the thermal stress and can recover automaticallyafter the short releases. Additionally, the TPS61178x also has OVP and thermal protection to avoidthe fault operation. The TPS61178x is in a 3.0-mm x 3.5-mm 13-pin VQFN package with enhancedthermal dissipation.
1. Who are the staff in your R & D department? What are your qualifications?
-R & D Director: formulate the company’s long-term R & D plan and grasp the direction of research and development; Guide and supervise r&d department to implement company r&d strategy and annual R&D plan; Control the progress of product development and adjust the plan; Set up excellent product research and development team, audit and training related technical personnel.
R & D Manager: make new product R & D plan and demonstrate the feasibility of the plan; Supervise and manage the progress and quality of r&d work; Research new product development and propose effective solutions according to customer requirements in different fields
R&d staff: collect and sort out key data; Computer programming; Conducting experiments, tests and analyses; Prepare materials and equipment for experiments, tests and analyses; Record measurement data, make calculations and prepare charts; Conduct statistical surveys
2. What is your product research and development idea?
- Product conception and selection product concept and evaluation product definition and project plan design and development product testing and validation launch to market